Buildings.Controls.Sources.Examples
Collection of models that illustrate model use and test models
Information
This package contains examples for the use of models that can be found in Buildings.Controls.Sources.
Extends from Modelica.Icons.ExamplesPackage (Icon for packages containing runnable examples).
Package Content
| Name | Description |
|---|---|
| Example model for the source that outputs the type of the day |
Buildings.Controls.Sources.Examples.DayType
Example model for the source that outputs the type of the day
Information
This example generates signals for three different work weeks.
The instance dayTypMon outputs a signal with five working
days, followed by two non-working days.
The instance dayTypSat does the same, except that the first
days is a non-working day.
The instance dayTypTwoWeeks outputs six working days, followed
by 8 non-working days.
The instance dayTypMonThr is configured the same as
dayTypMon, except that it outputs the type of the day
for three days, starting with the current day, then the next day and
the day after.
Extends from Modelica.Icons.Example (Icon for runnable examples).