<?xml version="1.0" encoding="UTF-8"?><xml><records><record><source-app name="Biblio" version="7.x">Drupal-Biblio</source-app><ref-type>17</ref-type><contributors><authors><author><style face="normal" font="default" size="100%">Mingsheng Liu</style></author><author><style face="normal" font="default" size="100%">Jingjuan Feng</style></author><author><style face="normal" font="default" size="100%">Zhan Wang</style></author><author><style face="normal" font="default" size="100%">Keke Zheng</style></author><author><style face="normal" font="default" size="100%">Xiufeng Pang</style></author></authors></contributors><titles><title><style face="normal" font="default" size="100%">Impacts of Static Pressure Reset on VAV System Air Leakage, Fan Power, and Thermal Energy</style></title><secondary-title><style face="normal" font="default" size="100%">ASHRAE Transactions</style></secondary-title></titles><dates><year><style  face="normal" font="default" size="100%">2010</style></year></dates><volume><style face="normal" font="default" size="100%">116</style></volume><pages><style face="normal" font="default" size="100%">428-436</style></pages><language><style face="normal" font="default" size="100%">eng</style></language><issue><style face="normal" font="default" size="100%">1</style></issue></record><record><source-app name="Biblio" version="7.x">Drupal-Biblio</source-app><ref-type>17</ref-type><contributors><authors><author><style face="normal" font="default" size="100%">Young-Hum Cho</style></author><author><style face="normal" font="default" size="100%">Mingsheng Liu</style></author><author><style face="normal" font="default" size="100%">Xiufeng Pang</style></author></authors></contributors><titles><title><style face="normal" font="default" size="100%">Improving Control and Operation of a Single Duct VAV System through CCLEP</style></title><secondary-title><style face="normal" font="default" size="100%">ASHRAE Transactions</style></secondary-title></titles><dates><year><style  face="normal" font="default" size="100%">2009</style></year><pub-dates><date><style  face="normal" font="default" size="100%">07/2009</style></date></pub-dates></dates><volume><style face="normal" font="default" size="100%">115</style></volume><pages><style face="normal" font="default" size="100%">760-768</style></pages><language><style face="normal" font="default" size="100%">eng</style></language><abstract><style face="normal" font="default" size="100%">&lt;p&gt;With the energy crisis of the early 1970s came the realization that buildings could be made much more efficient without sacrificing comfort. Over the last 30 years, use of variable air volume systems has become common practice. Many variable air volume (VAV) systems with pneumatic controls were installed in the 1980s and are still in use. However, these systems often have outdated control strategies and deficient mechanical systems are deficient, which may cause occupant discomfort and excess energy consumption.&lt;/p&gt;&lt;p&gt;An ASHRAE committee proposed building commissioning in 1988 to ensure that system performance met design specifications. Continuous Commissioning (CC[R]) technology was developed and implemented in 1992. CC is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities [1-5]. Since 1999, the Energy Systems Laboratory (ESL) at the University of Nebraska has conducted extensive research to implement optimal system control during the design phase and finalize the optimal setpoints after system installation. ESL researchers have developed and implemented the Continuous Commissioning Leading Energy Project (CCLEP) process with federal and industry support. The CCLEP process has two stages: the contracting stage and the implementation stage. During the contracting stage, a comprehensive technical evaluation is performed. The CCLEP implementation stage involves planning, retrofit and trouble shooting, and optimization and follow-up. The CCLEP process, procedures and seven case study results are presented in [6].&lt;/p&gt;&lt;p&gt;This paper presents information on the case study facility, existing and improved control sequences, and building performance improvement and energy consumption measures before and after CCLEP implementation&lt;/p&gt;</style></abstract><issue><style face="normal" font="default" size="100%">2</style></issue></record><record><source-app name="Biblio" version="7.x">Drupal-Biblio</source-app><ref-type>47</ref-type><contributors><authors><author><style face="normal" font="default" size="100%">Lixia Wu</style></author><author><style face="normal" font="default" size="100%">Mingsheng Liu</style></author><author><style face="normal" font="default" size="100%">Gang Wang</style></author><author><style face="normal" font="default" size="100%">Xiufeng Pang</style></author></authors></contributors><titles><title><style face="normal" font="default" size="100%">Integrated Static Pressure Reset with Fan Air Flow Station in Dual-duct VAV System Control</style></title><secondary-title><style face="normal" font="default" size="100%">ASME Energy Sustainability</style></secondary-title></titles><dates><year><style  face="normal" font="default" size="100%">2007</style></year><pub-dates><date><style  face="normal" font="default" size="100%">2007</style></date></pub-dates></dates><pub-location><style face="normal" font="default" size="100%">Long Beach, CA</style></pub-location><language><style face="normal" font="default" size="100%">eng</style></language></record></records></xml>